Low Cost Journal,International Peer Reviewed and Refereed Journals,Fast Paper Publication approved journal IJEDR(ISSN 2321-9939) apply for ugc care approved journal, UGC Approved Journal, ugc approved journal, ugc approved list of journal, ugc care journal, care journal, UGC-CARE list, New UGC-CARE Reference List, UGC CARE Journals, ugc care list of journal, ugc care list 2020, ugc care approved journal, ugc care list 2020, new ugc approved journal in 2020, Low cost research journal, Online international research journal, Peer-reviewed, and Refereed Journals, scholarly journals, impact factor 7.37 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool)
INTERNATIONAL JOURNAL OF ENGINEERING DEVELOPMENT AND RESEARCH
(International Peer Reviewed,Refereed, Indexed, Citation Open Access Journal)
ISSN: 2321-9939 | ESTD Year: 2013

Current Issue

Call For Papers
June 2023

Volume 11 | Issue 2
Last Date : 29 June 2023
Review Results: Within 12-20 Days

For Authors

Archives

Indexing Partner

Research Area

LICENSE

Paper Details
Paper Title
study on reduction of cost overrun and time delay in building construction using six sigma
Authors
  salma.k,  sheik farid.a

Abstract
There have been a lot of defects in recent years and errors may occur in a regular construction routine. In the construction of buildings, mistakes are very common. The time, complexity, budget and schedule of the proposed project can be affected by these major and some minor defects. The intent of this project is to identify and analyze the major and minor contributing problems and their corresponding defects happening in onsite construction work progress namely (Marking layout, Excavation, Foundation and Construction of brick walls) that they are responsible for causing cost overrun and time delay in construction management and also in this project six-sigma technique was implemented to rectify such defects and also the principle named as (DMAIC-Define, Measure, Analyze, Improve and Control) was incorporated to segregate and minimize such defects in each activities. And then the improve measures are recommended as well as the control plan was tabulated to control those defects and to secure the construction work progress from cost-overrun and time delay and control.

Keywords- six- sigma, cost overrun, time delay, reducing defects, on-site activities.
Publication Details
Unique Identification Number - IJEDR2103006
Page Number(s) - 38-45
Pubished in - Volume 9 | Issue 3 | September 2021
DOI (Digital Object Identifier) -    http://doi.one/10.1729/Journal.27602
Publisher - IJEDR (ISSN - 2321-9939)
Cite this Article
  salma.k,  sheik farid.a,   "study on reduction of cost overrun and time delay in building construction using six sigma", International Journal of Engineering Development and Research (IJEDR), ISSN:2321-9939, Volume.9, Issue 3, pp.38-45, September 2021, Available at :http://www.ijedr.org/papers/IJEDR2103006.pdf
Share This Article


Article Preview

ISSN Details




DOI Details



Providing A digital object identifier by DOI
How to get DOI?

For Reviewer /Referral (RMS)

Important Links

NEWS & Conference

Digital Library

Our Social Link

© Copyright 2024 IJEDR.ORG All rights reserved