Scheduling, Monitoring And Cost Analysis By Earned Value Method Of Phase-2 (Reach-2a From Pier No.443 To Pier No.470) Using Primavera P6
Authors
  Nagaraj Belsur,  Brijbhushan S,  Maneeth P D
Abstract
Earned Value Management (EVM) is a technique that consolidates extension, calendar, and asset estimations to survey extend execution and advance, it includes the joining of the three key components of venture which are timetable, work degree, and cost.The following study concentrate on the checking of venture process entitled "standard plan components" for a Metro extend at BMRCLSo that some missing of conventional successful framework for the monitoring and controlling task in a portion of the cost has brought about a noteworthy issues due to that occurs on disappointments of numerous temporary workers. In the development field or business because of that some clients turn into a disappointed, what they get is some of past the point of no return conveyances because of that the price will be over cost. The review is completed for built up, A viable framework for monitoring and controlling for the cost of a venture, with the goal that venture cost has the fundamental elements for success of a venture (EVM) earned esteem administration is a best procedure for assessment which is useful for the venture administration. this system helps in the spending cost and genuine cost the present ponder manages the planning and venture observing procedure , so that accommodating for the parameters which is included in the counts of EVM in common development ventures
Keywords- EVM,EARNED VALUE,ACTUAL COST,PLANNED VALUE
Publication Details
Unique Identification Number - IJEDR1703093Page Number(s) - 625-632Pubished in - Volume 5 | Issue 3 | August 2017DOI (Digital Object Identifier) -    Publisher - IJEDR (ISSN - 2321-9939)
Cite this Article
  Nagaraj Belsur,  Brijbhushan S,  Maneeth P D,   "Scheduling, Monitoring And Cost Analysis By Earned Value Method Of Phase-2 (Reach-2a From Pier No.443 To Pier No.470) Using Primavera P6", International Journal of Engineering Development and Research (IJEDR), ISSN:2321-9939, Volume.5, Issue 3, pp.625-632, August 2017, Available at :http://www.ijedr.org/papers/IJEDR1703093.pdf
Article Preview
|
|
||||||
|